Use the real specification
Record variety or recipe, individual product format, maturity or production condition, moisture-sensitive quality requirements and any known limits.
Use this practical protocol to plan a representative vacuum-cooling trial, record pressure and temperature performance, check moisture and product condition, and convert a successful test into realistic production-throughput data.
Vacuum-cooling performance depends on product characteristics, packaging, load density, starting temperature, target temperature and equipment configuration. A representative trial should therefore be designed around the intended production duty rather than an artificially light or open test load.
Record variety or recipe, individual product format, maturity or production condition, moisture-sensitive quality requirements and any known limits.
Use realistic cartons, crates, liners, bags, trays, pallet wrapping, trolley loading and batch mass so airflow and vapour-release paths reflect normal production.
Agree entering temperature, target temperature, acceptable temperature spread, maximum cycle interval, quality criteria and required hourly throughput before the test begins.
A useful final report should retain the product specification, load arrangement, packaging, batch weight, probe map, starting conditions, pressure curve, temperature curves, total cycle interval, final temperature spread, weight or moisture observations, product-quality observations and calculated production throughput.
Where the product is new to vacuum cooling, the result should be treated as application-specific until comparable production conditions have been demonstrated.
Check vent paths, liners, bags, film and commercial load configuration before testing.
Review packaging → Production capacityConvert the validated cycle interval and batch size into realistic hourly and shift capacity.
Check throughput → ProcurementCarry the validated product, load and duty data into a clearer supplier specification.
Build the RFQ → Acceptance testingUse the trial data to define measurable acceptance criteria for factory and site testing.
Open FAT/SAT checklist →Product or recipe, packaging, load mass, entering and target temperatures, current cooling method and required throughput provide the starting point for a representative validation plan.