Vacuum Cooler Sizing Calculator

Enter your required pallets per hour. This calculator plans for two complete loads per hour, or three for mushrooms, subject to engineering confirmation.

Production inputs

Planning result

Temperature pull-down 24.0 °C
Product throughput 2.80 t/h
Calculated pallet positions 4.00
Next standard chamber size 4 pallets

This is a throughput-planning result, not a final machine specification. Final selection must verify product behaviour, packaging, batch mass, vacuum duty, refrigeration duty, loading time, ambient conditions and destination requirements.

What this calculator tells you

Required pallet positions equal hourly pallet demand divided by complete loads per hour. Standard planning uses two loads per hour and mushrooms use three. Final equipment selection must confirm actual cycle time and duty.

Why pallet count is only the first filter

Two six-pallet loads can impose very different duties. Product mass, temperature pull-down, moisture behaviour, packaging and site conditions all influence the required vacuum and refrigeration systems. The standard chamber size therefore needs an engineering check before quotation.

Confirm the achievable full-cycle rate

Two loads per hour require a full cycle of no more than 30 minutes; three loads per hour require no more than 20 minutes. This includes loading, cooling, pressure recovery, unloading and resetting. Confirm feasibility and operating interruptions against the application before ordering.

Continue the planning process

Check the result with the Vacuum Cooling Throughput Calculator, compare the full pallet vacuum cooler range, or request an engineering review.